One of the things I really like about working for the Stephen Joseph Theatre is that we are playing in repertoire, which means that sometimes, quite randomly, we get time off. Actors normally do 8 shows a week and work six days out of seven (panto season is the exception, over Christmas it's not unusual to do 20 shows and work eight days per week. I'm exaggerating less than you think) so a three day weekend is a rarity and a delight.
How delighted was I to discover I had one of these coming up on August 5th! Ladies and Gentlemen, I have taken a double dose of carbon footprint denial and booked my flight home early Friday morning.
I am going to catch up with the excellent work Paul has been doing in my absence. I'm not expecting that much will have moved on as I know that Paul took Nikki and family to the UK for their holidays (lucky them!) but I know that he has stripped back the crappy wood round the windows and re-pointed:
He's also stripped back the rotten flooring in the attic. The good pieces to be recycled as oak shelving, rotten pieces to be stored in my sentry box and burnt on my woodburner. When I get it. The floor joists appear to be in excellent condition but he's given them 3 coats of xylophene just in case any future nasties get any bright ideas about coming to stay.
My bathroom will hopefully be finished, I may have a new floor in the attic and best of all, I get to see the father of my baby and decide what colour to paint the nursery.
Baby??? Nursery???
Sorry, rather sprung that one on you from nowhere, didn't I? More later, I've got a show to open...
Showing posts with label little house. Show all posts
Showing posts with label little house. Show all posts
Tuesday, 26 July 2011
Saturday, 21 May 2011
Meanwhile Back In The Haute Vienne...
Paul has been busy. The downstairs is now unpartitioned:
The cupboard in the corner that used to house the loo has gone. No more embarrassing audio overshares from the downstairs toilet, on the subject of which, I am going to digress for a wee moment.
Do you remember the post about the open sewer running through my house? Well, Christophe-le-Plombier's dear boss sent me his bill.
€500!!!
Now I greatly appreciate the speed with which Christophe came to my aid, and the toilet, for the month or so it was in situe, was a joy to use. However... call me crazy, but I feel that €500 for replacing a bit of pipe and putting in a new loo is a little on the steep side. The loo alone cost nearly €150. It's a thing of beauty, but in my impoverished state, I'd have been perfectly happy with a budget bog from Mr. Bricolage. I email M. Carreau and make this point, also asking him to give me a breakdown on Christophe's hourly rate and the number of hours he worked. 6 apparently. At €40 per hour. I shall not be using them again.
The lovely loo is being moved upstairs to the bathroom, where Paul has discovered a fireplace. Like you do.
Isn't it fabulous? Trouble is, it interferes with the layout for the bathroom. The options as Paul sees them are to change the layout of the bathroom, or accommodate the fireplace within the bathroom, which may involve rebuilding the side of the fireplace. I'm not sure. How can I be? I need to be there, to look at it and scratch my chin aimlessly for a few hours. I need to contemplate a corner bath, decide whether I really hate them as much as I think I do (with apologies to my brothers Leo and Giles in whose corner baths I have spent many a contemplative hour) and think whether I'm prepared to sacrifice the 170 cm bath I've already spent €120 on...
Suggestions gratefully received...
The cupboard in the corner that used to house the loo has gone. No more embarrassing audio overshares from the downstairs toilet, on the subject of which, I am going to digress for a wee moment.
Do you remember the post about the open sewer running through my house? Well, Christophe-le-Plombier's dear boss sent me his bill.
€500!!!
Now I greatly appreciate the speed with which Christophe came to my aid, and the toilet, for the month or so it was in situe, was a joy to use. However... call me crazy, but I feel that €500 for replacing a bit of pipe and putting in a new loo is a little on the steep side. The loo alone cost nearly €150. It's a thing of beauty, but in my impoverished state, I'd have been perfectly happy with a budget bog from Mr. Bricolage. I email M. Carreau and make this point, also asking him to give me a breakdown on Christophe's hourly rate and the number of hours he worked. 6 apparently. At €40 per hour. I shall not be using them again.
The lovely loo is being moved upstairs to the bathroom, where Paul has discovered a fireplace. Like you do.
Isn't it fabulous? Trouble is, it interferes with the layout for the bathroom. The options as Paul sees them are to change the layout of the bathroom, or accommodate the fireplace within the bathroom, which may involve rebuilding the side of the fireplace. I'm not sure. How can I be? I need to be there, to look at it and scratch my chin aimlessly for a few hours. I need to contemplate a corner bath, decide whether I really hate them as much as I think I do (with apologies to my brothers Leo and Giles in whose corner baths I have spent many a contemplative hour) and think whether I'm prepared to sacrifice the 170 cm bath I've already spent €120 on...
Suggestions gratefully received...
Tuesday, 3 May 2011
Subscribe to:
Posts (Atom)





